Key steps for speed dome installation, from foundation and pole to grounding, power, network, presets and patrol routes.
The long-term stability of the dome machine depends largely on the quality of the installation. Pole shaking, poor grounding, and insufficient power margin will all manifest as image jitter, freezes, or communication interruptions.
Foundation and pole
The foundation size is determined according to the height of the pole and the local wind load, and the embedded parts are kept horizontal; the verticality of the pole is corrected with a level. Large-magnification ball machines should be equipped with reinforced rods or choose thicker poles.
Grounding and lightning protection
The pole, equipment shell and power ground should be reliably connected, and the grounding resistance should be implemented according to on-site specifications; lightning arresters should be installed at the network and power inlets, and outdoor cables should be waterproofed.
Power supply
Select the power supply according to the rated power of the equipment and the peak power when heating and infrared are turned on, and the line voltage drop is controlled within the allowable range. Check the power supply margin and heating configuration in low-temperature areas.
Debugging sequence
First confirm the image and focus, then set the address and protocol, and then adjust the limit, preset position and cruise route. Finally, test the power-off memory, guard position and remote control.
Key points for acceptance
Check the wide-angle and telephoto images, nighttime infrared effects, wipers and defogger (if any), preset position return errors, and save the equipment configuration table.